[1] Etemad-Shahidi A, Bali M (2012) Stability of rubble-mound breakwater using H50 wave height parameter. Coastal Eng 59(1): 38-45.
[2] Mol A, Groeneveld RL, Waanders AJ (1984) Safety and Reliability of breakwaters. Proceedings of 19th Conference on Coastal Engineering, Houston, Texas.
[3] Hanzawa M, Sato H, Takahashi S, Shimosako K, Takayama T, Tanimoto K (1996) New stability formula for wave-dissipating concrete blocks covering horizontally composite breakwaters, Proc. 25th Int. Conf. Coastal Eng., American Society of Civil Engineering, Orlando, pp. 1665-1678.
[4] Ergin A, Balas CE (2002) Reliability-Based Risk Assessment of Rubble Mound Breakwaters under Tsunami Attack. J Coastal Res 36: 266–272.
[5] Kim DH, Park WS (2005) Neural network for design and reliability analysis of rubble mound breakwaters, Ocean Engineering 32: 1332–1349.
[6] Kim SW, Suh KD (2011) Evaluation of Target Reliability Indices and Partial Safety Factors for Sliding of Caisson Breakwaters. Journal of Coastal Research, SI 64 (Proceedings of the 11th International Coastal Symposium), 622-626.
[7] Lee CE, Kim G, Kim SU (2013) Stochastic reliability analysis of armor units of rubble-mound breakwaters under the multiple loads. Journal of Coastal Research, 65, 308–313. .
[8] بالی، م.، کریمایی طبرستانی، م.، جندقی علایی، م.، (1396) "طراحی آرمور موجشکنهای توده سنگی بر اساس قابلیت اطمینان و تحلیل ریسک-مطالعه موردی: بندر نوشهر" نشریه دریا فنون، 4(2)، صفحه 53 تا 63.
[9] Alises A, Molina R, Gomez R, Pery P, Castillo C (2014) Overtopping hazards to port activities: Application of a new methodology to risk management (POrt Risk MAnagement Tool), Reliability Eng & Sys Safety 123: 8–20.
[10] احمدی، ح. و نیک نژاد، آ.، (1396) "ارزیابی قابلیت اعتماد موجشکنهای توده سنگی در برابر گسیختگی ناشی از روگذری امواج" نشریه دریا فنون، 4(3)، صفحه 60 تا 72.
[11] Romano, A., Bellotti, G., Briganti, R., Franco, L., “Uncertainties in the Physical Modelling of the Wave Overtopping over a Rubble Mound Breakwater: The Role of the Seeding Number and of the Test Duration”, Coastal Engineering, Vol.103, pp.15-21, 2015.
[12] Galiatsatou, P., Makris, C., Prinos, P. “Optimized Reliability Based Upgrading of Rubble Mound Breakwaters in a Changing Climate”, Journal of Marine Science and Engineering, Vol. 6, pp.92, 2018.
[13] Abaei, M., Abbassi, R., Garaniya, V., Chai, S., Khan, F., “Reliability Assessment of Marine Floating Structures Using Bayesian Network”, Applied Ocean Research, Vol. 76, pp. 51–60, 2018.
[14] Malliouri, D.I., Memos, C.D., Soukissian, T.H., Tsoukala, V.K., “Reliability analysis of rubble mound breakwaters An easy-to-use methodology”, 1st International Conference on Design and Management of Port, Coastal, and Offshore Works Athens, Greece, 8-11 May 2019.
[15] Spanos, P. D., F. M. Strati, G. Malara, and F. Arena. “An Approach for Nonlinear Stochastic Analysis of U-shaped OWC Wave Energy Converters” Probability Engineering Mechanics, Vol. 54, pp. 44–52. 2018.
[16] Vicinanza, D., Lauro, E., Contestabile, P., Gisonni, C., Lara, J., Losada, I., “Review of Innovative Harbor Breakwaters for Wave-Energy Conversion”, Journal of Waterway, Port, Coastal, and Ocean Engineering, Vol.145(4), pp. 03119001. 2019.
[17] Hudson RY., “Design of Quarry Stone Cover Layer for Rubble Mound Breakwaters”, Research Report No. 2-2, Waterways Experiment Station, Coastal Engineering Research Centre, Vicksburg, MS.
[18] Van der Meer JW (1988) Rock slopes and gravel beaches under wave attack, The Netherlands: Delft University of Technology, Ph.D. dissertation.
[19] The Rock Manual (2007) The Use of Rock in Hydraulic Engineering, CIRIA- CUR CETMEF (C683).
[20] Nowak A.S. and Collins K.R., Reliability of Structures, McGraw Hill, Singapore. 2000.
[21] Halder A, Mahadevan S (2000) Probability, Reliability and Statistical Methods in Engineering Design. John Wiley & Son, New York, 304p.
[22] Muzzammil M., Siddiqui N, A., and Siddiqui A. F. (2008). Reliability considerations in bridge pier scouring. J. Structural Eng. and Mechanics, 28(1), 1-18.
[23] سایت سازمان سواحل و دریانوردی کشور، اطلاعات مربوط به بندر نوشهر.
www.PMO.ir
[24] Rackwitz R, Fiessler B (1976) Note on Discrete Safety Checking When Using Non-Normal Stochastic Models for Basic Variables. Load Project Working Session. Cambridge, MA: MIT.